Skip to main content

Case Study - Eliminating Operational Downtime Through Legacy Network Modernization

SETCOM transformed Ingadale Industries' aging network infrastructure, eliminating costly downtime and enabling seamless 24/7 operations.

Client
Ingadale Industries
Industry
Manufacturing
Service
IT, Network Infrastructure, MSP

Overview

Ingadale Industries, a large scale manufacturing firm with clientele across private and public sectors, was experiencing critical network failures that brought production lines to a halt on a daily basis, in fact multiple times throughout the day. This led to miscommunication with clients, missed deadlines and overall loss of revenue. Their legacy network infrastructure—comprised of aging switches, outdated routers, and deteriorating cabling—could no longer support the demands of modern manufacturing operations. Each network outage resulted in significant production losses, frustrated employees, and delayed order fulfillment.

The root cause was clear: hardware that had exceeded its operational lifespan, lacked redundancy, and had no proactive monitoring in place. Network bottlenecks during peak production hours were common, and the IT team spent more time firefighting than planning for growth.

SETCOM stepped in with a comprehensive network modernization strategy. We began by conducting a thorough infrastructure audit, identifying all critical failure points and bottlenecks. Then, we executed a carefully planned migration that minimized disruption to ongoing operations.

What we did

  • Network Infrastructure
  • Legacy Hardware Replacement
  • Redundancy & High Availability
  • Proactive Monitoring

"The network modernization was a game-changer. We went from constant firefighting to smooth, uninterrupted operations. SETCOM's approach was methodical and professional—they understood our need for zero downtime during the transition."

Gaurav Vaghela, Operations Director at Ingadale Industries
Network Uptime Achieved
99.99%
Production Disruptions
0
Network Performance Improvement
3x
Proactive Monitoring
24/7

More case studies

Powering Twig Fertility's Tech-Enabled Expansion

SETCOM powered Twig Fertility’s growth with full IT, security, and management for seamless, clinic-wide operations.

Read more

Empowering Skilled Trades

Partnering with Sheet Metal Workers and Roofers Local 30 to modernize operations and strengthen member engagement.

Read more

Tell us about your project

Our offices

  • Scarborough
    104 Crockford Blvd
    Unit 208, Ontario, Canada
  • Richmond Hill
    10225 Yonge St
    Unit R, Ontario, Canada